 |
 |
TITLE |
 |
DESCRIPTION |
 |
ISSUE DATE |
 |
 |
 |
 |
 |
Economic Impact Study:
Abbot Point Coal Terminal Expansion and Development of a Multi-Cargo Facility
(258K) |
 |
This study is a preliminary economic impact assessment. It utilises a range of publicly available data regarding the scope and timing of the development, as well as information and assumptions based on similar developments and Ports Corporation of Queensland’s (PCQ’s) understanding of the necessary supporting infrastructure and associated facilities.
|
 |
21 Jul 2008 |
 |
 |
 |
 |
 |
Port of Abbot Point Port Rules and Charges (203K) |
 |
The business operations of the port are regulated by port notices. This reference document contains instructions for the orderly conduct of business and public safety in the Port of Abbot Point. |
 |
01 Jul 2008 |
 |
 |
 |
 |
 |
Ports Corporation of Queensland Economic Impact Study (Full Report) (322K) |
 |
This publication shows the significance of the partnerships forged between PCQ ports and regional businesses. The direct and flow-on economic benefits created contribute to Queensland business and, importantly, to jobs and household incomes, particularly for those living in regional communities. |
 |
20 Mar 2008 |
 |
 |
 |
 |
 |
Ports Corporation of Queensland Economic Impact Study (Summary Document) (1249K) |
 |
This publication shows the significance of the partnerships forged between PCQ ports and regional businesses. The direct and flow-on economic benefits created contribute to Queensland business and, importantly, to jobs and household incomes, particularly for those living in regional communities. |
 |
20 Mar 2008 |
 |
 |
 |
 |
 |
2006-07 Ports and Projects Report (1164K) |
 |
This publication details port by port activities addressing trade, operations and development which occured in 2006-07. |
 |
14 Nov 2007 |
 |
 |
 |
 |
 |
2006-07 Sustainability Report (4450K) |
 |
This publication details PCQ's triple bottom line performance in environmental, social and economic areas for the financial year 2006-07. |
 |
14 Nov 2007 |
 |
 |
 |
 |
 |
Port of Abbot Point Port Rules and Charges (194K) |
 |
The business operations of the port are regulated by port notices. This reference document contains instructions for the orderly conduct of business and public safety in the Port of Abbot Point. |
 |
01 Jul 2007 |
 |
 |
 |
 |
 |
Mourilyan Harbour and Abbot Point surveys for monitoring the endemic coastal biota and for detection of invading species. (320K) |
 |
Mourilyan Harbour and Abbot Point were surveyed for endemic biota and introduced species in June and July 1998. The survey focussed on habitats in the vicinity of the berth at each port that were likely to be colonised by introduced species. The survey methodology broadly followed the sampling protocols outlined in Hewitt and Martin (1996) with some difications to allow for the specific environmental characteristics of the ports studied. |
 |
10 Apr 2007 |
 |
 |
 |
 |
 |
Supplement Report to the Environmental Impact Statement (293K) |
 |
The Stage 3 Expansion has been the subject of an Environmental Impact
Statement (EIS) prepared by WBM Pty Ltd (WBM 2006). This EIS has been prepared in accordance
with the State Development and Public Works Organisation Act 1971 (SDPWOA). The EIS was
released to government Referral Agencies and the public for a 6-week statutory review period
commencing on the 11 March 2006. Submissions were invited and were to be forwarded to the
Coordinator General (CG). Submissions subsequently received by the CG have been forwarded to
PCQ for a response. This Supplement, which has been prepared by WBM on behalf of PCQ, thus
provides the compilation of responses to the submissions made. |
 |
11 Dec 2006 |
 |
 |
 |
 |
 |
Figure S-1 (593K) |
 |
Groundwater Elevation Values |
 |
11 Dec 2006 |
 |
 |
 |
 |
 |
Figure S-2 (504K) |
 |
Holdings in Expansion Area |
 |
11 Dec 2006 |
 |
 |
 |
 |
 |
Figure S-3 (464K) |
 |
Environmentally Sensitive Areas |
 |
11 Dec 2006 |
 |
 |
 |
 |
 |
Appendix A (803K) |
 |
DNRW Correspondence and Project Clearing Code |
 |
11 Dec 2006 |
 |
 |
 |
 |
 |
Appendix B (335K) |
 |
Section 86 Approval Service Jetty |
 |
11 Dec 2006 |
 |
 |
 |
 |
 |
Appendix C (38K) |
 |
Project Approvals |
 |
11 Dec 2006 |
 |
 |
 |
 |
 |
Appendix D (129K) |
 |
Acid Sulfate Soil Assissment |
 |
11 Dec 2006 |
 |
 |
 |
 |
 |
Appendix E (831K) |
 |
Air Quality Assessment |
 |
11 Dec 2006 |
 |
 |
 |
 |
 |
Appendix F (48K) |
 |
Water Quality Data |
 |
11 Dec 2006 |
 |
 |
 |
 |
 |
2005-06 Ports, People and Projects Report (482K) |
 |
This publication details port by port activities addressing trade, operations and development which occured in 2005-06. |
 |
15 Nov 2006 |
 |
 |
 |
 |
 |
2005-06 Sustainability Report (2538K) |
 |
This publication details PCQ's triple bottom line performance in environmental, social and economic areas for the financial year 2005-06. |
 |
15 Nov 2006 |
 |
 |
 |
 |
 |
Review of Land Use Plan - Statement of Proposals (510K) |
 |
PCQ has identified the need to update its planning strategy for the Port of Abbot Point, considering proposed expansions for the coal terminal and other strategic influences within the port area and region. This Statement of Proposal provides a background and commentary on the preparation of an updated Land Use Plan. The nature of the Land Use Plan is detailed in Section 2, and the intent of this document is described in Section 3.
|
 |
15 Mar 2006 |
 |
 |
 |
 |
 |
Appendix H (207K) |
 |
Groundwater Supply Investigation Report |
 |
13 Mar 2006 |
 |
 |
 |
 |
 |
Appendix I (681K) |
 |
Baseline Groundwater Monitoring Investigation |
 |
13 Mar 2006 |
 |
 |
 |
 |
 |
Appendix J (166K) |
 |
Flora and Fauna Database Information |
 |
13 Mar 2006 |
 |
 |
 |
 |
 |
Appendix K (3045K) |
 |
Air Quality Assessment |
 |
13 Mar 2006 |
 |
 |
 |
 |
 |
Appendix K (2) (228K) |
 |
Air Quality Assessment - Predicted Terminal Dust Emissions Report |
 |
13 Mar 2006 |
 |
 |
 |
 |
 |
Appendix L (340K) |
 |
Noise Assessment |
 |
13 Mar 2006 |
 |
 |
 |
 |
 |
Appendix M (523K) |
 |
Department of Primary Industries and Fisheries - Port of Abbot Point Seagrass, Algae, and Benthic Macro-Invertebrate Community Survey - March 2005 |
 |
13 Mar 2006 |
 |
 |
 |
 |
 |
Appendix N (387K) |
 |
Marine Sediment - SAP Investigation Results |
 |
13 Mar 2006 |
 |
 |
 |
 |
 |
Appendix O (2663K) |
 |
Assessment of Coal in Marine Sediments at Abbot Point |
 |
13 Mar 2006 |
 |
 |
 |
 |
 |
Appendix O (2) (1646K) |
 |
Assessment of Coal in Marine Sediments at Abbot Point - Laboratory Results |
 |
13 Mar 2006 |
 |
 |
 |
 |
 |
Appendix P (2669K) |
 |
Coastal Processes - Hydrodynamic and Plume Modelling |
 |
13 Mar 2006 |
 |
 |
 |
 |
 |
Appendix Q (36K) |
 |
Decision Criteria |
 |
13 Mar 2006 |
 |
 |
 |
 |
 |
Appendix R (15K) |
 |
Summary of Commitments |
 |
13 Mar 2006 |
 |
 |
 |
 |
 |
Appendix A (580K) |
 |
Terms of Reference |
 |
11 Mar 2006 |
 |
 |
 |
 |
 |
Appendix B (33K) |
 |
Details on Proponent, EIS Study Team and PCQ Environment Policy |
 |
11 Mar 2006 |
 |
 |
 |
 |
 |
Appendix C (12K) |
 |
List of Approval Required |
 |
11 Mar 2006 |
 |
 |
 |
 |
 |
Appendix D (55K) |
 |
DEH EPBC Referral Response |
 |
11 Mar 2006 |
 |
 |
 |
 |
 |
Appendix E (912K) |
 |
Community Consultation Plan |
 |
11 Mar 2006 |
 |
 |
 |
 |
 |
Appendix F (321K) |
 |
Assessment of Land Disposal Options for Dredge Spoil at the Port of Abbot Point - Executive Summary |
 |
11 Mar 2006 |
 |
 |
 |
 |
 |
Appendix G (1564K) |
 |
Preliminary Acid Sulfate Soil Investigation - Abbot Point Expansion - Revised Report - Stage 2 and 3 Development Areas. |
 |
11 Mar 2006 |
 |
 |
 |
 |
 |
Figure 5-3 (89K) |
 |
Coastal Resources - Abbot Point Area |
 |
10 Mar 2006 |
 |
 |
 |
 |
 |
Figure 5-4 (276K) |
 |
Environmentally Sensitive Areas at Abbot Point - EPA Designation |
 |
10 Mar 2006 |
 |
 |
 |
 |
 |
Figure 5-5 (112K) |
 |
Proposed Accommodation Camp |
 |
10 Mar 2006 |
 |
 |
 |
 |
 |
Figure 5-6 (78K) |
 |
Wind Rose - Abbot Point Coal Terminal (October 1998-July 2004) |
 |
10 Mar 2006 |
 |
 |
 |
 |
 |
Figure 5-7 (66K) |
 |
Geology of the Abbot Point Area |
 |
10 Mar 2006 |
 |
 |
 |
 |
 |
Figure 5-8 (1092K) |
 |
Site Topography, Landforms and Soils |
 |
10 Mar 2006 |
 |
 |
 |
 |
 |
Figure 5-9 (339K) |
 |
Cross-section throught Abbot Point Landform |
 |
10 Mar 2006 |
 |
 |
 |
 |
 |
Figure 5-10 (538K) |
 |
Soil and Groundwater Investigation Area |
 |
10 Mar 2006 |
 |
 |
 |
 |
 |
Figure 5-11 (359K) |
 |
Abbot Point - Caley Valley Wetland |
 |
10 Mar 2006 |
 |
 |
 |
 |
 |
Figure 5-12 (239K) |
 |
Abbot Point Coal Terminal Catchment and Water Management - Existing Arrangements |
 |
10 Mar 2006 |
 |
 |
 |
 |
 |
Figure 5-13 (114K) |
 |
Abbot Point Area - Storm Surge Hazard (1:100 year) |
 |
10 Mar 2006 |
 |
 |
 |
 |
 |
Figure 5-14 and Figure 5-15 (62K) |
 |
Graphs of the Electrical conductivity and pH at the Primary and Secondary Settlement Ponds (1997 - 2005) (1997 - 2004) |
 |
10 Mar 2006 |
 |
 |
 |
 |
 |
Figure 5-16 (58K) |
 |
Electrical conductivity and pH within the Abbot Point - Caley Valley Wetland (1997 - 2004) |
 |
10 Mar 2006 |
 |
 |
 |
 |
 |
Figure 5-17 (21K) |
 |
Salinity & pH on the 20th April 2005 |
 |
10 Mar 2006 |
 |
 |
 |
 |
 |
Figure 5-18 (63K) |
 |
Turbidity and dissolved oxygen on the 20th April 2006 |
 |
10 Mar 2006 |
 |
 |
 |
 |
 |
Figure 5-19 and 5-20 (62K) |
 |
Principal Component Analysis for waters sampled on the 20th April 2005 and
Total and Dissolved Elements within Runoff - 20th June 2005 |
 |
10 Mar 2006 |
 |
 |
 |
 |
 |
Figure 5-21 (49K) |
 |
Remnant Regional Ecosystem Status For The Terminal and adjacent wetlands (Qld Herbarium) |
 |
10 Mar 2006 |
 |
 |
 |
 |
 |
Figure 5-22 (2405K) |
 |
Biodiversity Planning Assessment Mapping for the Study Area (EPA, 2003 and 2005) |
 |
10 Mar 2006 |
 |
 |
 |
 |
 |
Figure 5-23 (1027K) |
 |
Remnant Regional Ecosystem Mapping for Investigation Area (Qld Herbarium) |
 |
10 Mar 2006 |
 |
 |
 |
 |
 |
SECTION ONE: Introduction (99K) |
 |
This section includes a description of the project, details on the environmental impact assessment process and the public consultation process. The section also details the legislative and planning framework applicable to the project. |
 |
10 Mar 2006 |
 |
 |
 |
 |
 |
Figure 1-1 (457K) |
 |
The location of the Port of Abbot Point |
 |
10 Mar 2006 |
 |
 |
 |
 |
 |
Figure 5-24 (42K) |
 |
Historical Air Photo Coverage of the Port Area |
 |
10 Mar 2006 |
 |
 |
 |
 |
 |
Figure 5-25 (2048K) |
 |
Biodiversity Planning Assessment Mapping for the Study Area (EPA, 2003 and 2005) |
 |
10 Mar 2006 |
 |
 |
 |
 |
 |
Figure 5-26 (486K) |
 |
Remnant Regional Ecosystem Distribution Across the Investigation Area WBM Survey |
 |
10 Mar 2006 |
 |
 |
 |
 |
 |
Figure 5-27 (117K) |
 |
Average Annual TSP Locations - Existing Scenario |
 |
10 Mar 2006 |
 |
 |
 |
 |
 |
Figure 5-28 (129K) |
 |
Average Annual TSP - Stage 3 Expansion |
 |
10 Mar 2006 |
 |
 |
 |
 |
 |
Figure 5-29 (106K) |
 |
Existing and Stage 3 Noise Emission Contours |
 |
10 Mar 2006 |
 |
 |
 |
 |
 |
Figure 5-30 (112K) |
 |
Seagrass community types as mapped by QDPI&F (from Rasheed et al. 2005) |
 |
10 Mar 2006 |
 |
 |
 |
 |
 |
Figure 5-31 (75K) |
 |
DPI&F commercial catch grids in the wider region, showing the position of grid M22 |
 |
10 Mar 2006 |
 |
 |
 |
 |
 |
Figure 5-32 (61K) |
 |
Total catch (tonnes) of finfish and shell fish in cell M22 (Bowen and Abbot Point) between 1988 and 2003 |
 |
10 Mar 2006 |
 |
 |
 |
 |
 |
Figure 5-33 (78K) |
 |
Background Water Quality Measurements at the Abbot Point Dredged Material Placement Area - 12-17th July 2005 |
 |
10 Mar 2006 |
 |
 |
 |
 |
 |
Figure 5-34 (146K) |
 |
Off-shore Water Quality Sampling Locations - PCQ Program |
 |
10 Mar 2006 |
 |
 |
 |
 |
 |
Figure 5-35 (88K) |
 |
Sediment Sampling Sites - Ecowise 2004 |
 |
10 Mar 2006 |
 |
 |
 |
 |
 |
Figure 5-36 (603K) |
 |
Sediment Sampling Locations - East and West Berth Areas - (July 2005) |
 |
10 Mar 2006 |
 |
 |
 |
 |
 |